+91 70565 55582[email protected]Get a quoteRequest a call
RTS Calibration
Menu

Pump head inspection and setup

A pump head is one part of a delivery system. On a peristaltic unit, the fitted tubing and drive setting affect delivery. On a piston unit, the head and stroke arrangement matter. Tell us which design you use and whether the requirement is for volume per stroke, flow rate or another quantity.

Send an enquiry
Pump head — equipment illustration
Equipment illustration
On this page

Delivered volume and the drive setting

For a delivery check, keep measured volume, elapsed time and the drive or controller identity together. A result taken with one fitted head and tube cannot be assigned to a different head merely because both fit the same drive.

Pump head paired with its drive and tubing

Identify the drive, tubing or displacement assembly, fluid and operating condition associated with the required result. If a delivery comparison is needed, name the quantity and observation interval. Keep a spare head’s identity separate from the assembled pump configuration used for measurement.

Specifications and service checks

A service log may show only the drive speed even though the operator uses the pump for measured liquid delivery. To ask about delivered flow, identify the head, tubing or displacement element fitted and the time interval used for collection. A motor-speed result alone leaves delivery unresolved.

Range and configuration
Watson-Marlow’s 520R documentation relates delivered flow to the fitted tubing and drive. Record the head, tube and associated flow indicator separately in the equipment register.
Manufacturers and models
Watson-Marlow’s 520R is a pump head. Merck’s Q-Gard is an example of a water-system cartridge with an individual part number.
What we check
Record the head or cartridge part number and installation date. If a separately tagged flow or conductivity instrument requires calibration, identify it directly on the service request.
Reference equipment and accuracy
Use the measurement reference appropriate to that separate indicator. A change of consumable is a maintenance entry and has no independent calibration grade.
When to repeat the check
Review instrument results after replacement if the measured indication has changed. Use the component maker’s service schedule for the hardware itself.

Technical references Watson-Marlow 520R pump head · Merck water purification system manual

Enquire about Pump head

Service enquiry