Power transformer testing

Results on a power transformer are tied to the winding, phase, tap position and test conditions. A trend in winding resistance or ratio is difficult to interpret without those identifiers from the previous test.

Send an enquiry
Power transformer — equipment illustration
Equipment illustration
On this page

Tap position and winding records

Give the nameplate, winding diagram, tap schedule and measurements required for commissioning or maintenance. Include any earlier test sheet used for comparison. Identify accessory devices, such as separate temperature indicators, if their calibration is also included in the visit.

A three-phase resistance record should identify the terminal pair, tap and temperature for each observation. If a later maintenance test was performed under substantially different thermal conditions, compare the basis of the reported values before interpreting the difference as a winding change.

Specifications and service checks

Phase comparison on a large transformer can be confused by different tap positions or by using line values on one record and winding values on another. Supply the vector group, tap and terminal names from the operating diagram with any phase-specific concern.

Range and configuration
Rated kVA or MVA describes power capacity. Ratio, winding resistance, losses and insulation characteristics are separate test quantities.
Manufacturers and models
Hitachi Energy supplies transformer families with different ratings, vector groups and arrangements of taps. Use the nameplate to define the individual unit.
What we check
Compare turns ratio at the required taps and evaluate winding resistance at a documented temperature. For specified losses or loading, use the corresponding power measurement arrangement and state the winding connections.
Reference equipment and accuracy
Use calibrated ratio and resistance instruments or a suitable power measurement system, according to the required test. Include temperature measurement where corrections are applied.
When to repeat the check
Plan testing around commissioning, changes in condition, faults or maintenance and the asset owner's inspection programme.