+91 70565 55582[email protected]Get a quoteRequest a call
RTS Calibration
Menu

Calibration for IMT Kharkhoda

Check the tool tags against both copies of the Kharkhoda line register. During installation, a gauge can carry the contractor's number long after the plant assigns its own. Mark the tools production has accepted and the ones the installer still owns before booking the batch.

Send an enquiry

Before a line changes hands

Record the serial number alongside the plant tag, line designation and owner. For paired sensors and displays, list both serial numbers and say whether the process needs a result for the combination. For new torque tools, include the settings called for by the assembly instruction.

Which tools pass from the installer to production?

When a machine arrives with a crate of gauges, the installation register can use the supplier's numbers for tools that the plant has already tagged. Mark both numbers on the dispatch sheet. A torque wrench going back to the installer after acceptance belongs on a different return line from a checking gauge that stays with production. If purchasing has raised a single order, the handover list can still name a separate recipient for each.

For an inspection fixture that has yet to run its first part, ask the line engineer for the drawing revision and the feature to be checked. That gives the quotation a working size even before the plant has a previous certificate.

Site access in Sonipat district

Kharkhoda’s township lies alongside the KMP Expressway. State the entrance your contractor or security team uses and whether that team controls temporary access. Give separate contacts for construction stores and operating plant stores if they receive deliveries independently.

Instrument and repair enquiries

Related specialist work and guides

Service enquiry