A servomotor-controlled voltage regulator can indicate correct steady output while responding slowly to a change in input or load. A maintenance record should distinguish regulation accuracy from the time taken to recover.

Send an enquiry
Servo transformer — equipment illustration
Equipment illustration
On this page

Regulated voltage and time to recover

Identify the nominal input and output, phase arrangement, load and operating set point. State the variation to which the result relates and the final value used for acceptance. If a panel voltmeter is checked independently, keep its result separate from overall regulation.

A technician can record the lowest voltage during a load change, the final settled output, or the time taken to return within a band. The numbers describe three different behaviours. If only one is in question, mark it on the existing maintenance trace and include the unit and acceptance band.

Servo transformer measurements

Voltage indication, response to a changed supply and regulation under load are separate observations. Give the factory's operating conditions and access plan. RTS tests the regulator under the specified supply and load conditions and records individual meter results alongside the assembly measurements.

Specifications and service checks

A servo stabiliser might settle at the intended output after a supply dip yet take longer than the process permits. A record of input, output and elapsed recovery time defines that complaint more clearly than a single settled voltage.

Range and configuration
Quote the allowable input variation, nominal output voltage and test load. Steady-state regulation and response time describe different aspects of performance.
Manufacturers and models
Servokon offers servo-controlled voltage stabilisers. Identify input range, output rating, phase arrangement and the installed control settings.
What we check
Compare the regulated output at representative combinations of supply voltage and load, and check recovery time after a defined change where relevant.
Reference equipment and accuracy
Use calibrated true-RMS voltage and current references and a recorder with suitable timing performance. Specify the load used for the test.
When to repeat the check
Check after brush, servomotor or controller work and record fluctuations that recur at the same load.