Read the test settings from the bench sheet
For a bench supply, list the output channels and the voltage and current used during the test. For an LCR meter, send the component type, test frequency and fixture model. A test sheet that specifies capacitance at one frequency gives us a better starting point than the full catalogue range of the meter.
Moving a test fixture into production
Imagine a fixture accepted at a supplier's workshop and then sent to Kopparthy with the meter and power supply packed separately. An installation sheet may identify the equipment by bench name alone. Add the serial number for each item and the revision of the fixture drawing used for acceptance. If the production team has selected a different current limit since installation, carry the new value into the request.
Before closing the outward note, decide where the report belongs. The supplier may need a copy for its installation file while the plant retains the record for the instruments it now owns.
Keep the results with the right work package
Identify the Kopparthy line, electrical contractor or civil works package responsible for each item. Include the local stores contact, works PIN and address for the reports. If an IMT supplier needs its fixture back, mark that case with the supplier’s destination before it leaves so it can be returned separately.
