Show the usable shelf space
Identify which shelves, trays or compartments the owner needs covered. Give the temperature settings specified in the equipment protocol and say whether the cabinet will be empty or contain an approved representative load. Identify any access port and limits on routing recorder leads.
Describe what counts as a completed run
Supply the owner’s study window, temperature limits and requirements for the position-by-position record. If the protocol includes a door event or a recovery observation, list it separately. State whether the cabinet reference probe also needs an individual calibration result.
When the shelves change between runs
A cabinet that held two trays last quarter can have a different working space after a shelf is moved. Mark the current shelf heights and the part actually occupied on a simple sketch. Keep a dated copy with the study request. If quality needs to compare the result against an earlier run, identify the shelf positions that are genuinely comparable.
A door event or loss of power during a study belongs in the record even if the display later settles. Agree who timestamps such events and who will review the affected interval against the owner's study criteria.
Identify the room and the reviewer
For a cabinet in an IMT Rohtak sample room, give the laboratory contact who can clear the shelves and approve access. Include the reviewer’s reporting requirements if purchasing is handled at a different site.

