The kit behind the inspection sheet
An electrical inspection sheet can call for both earth resistance and insulation resistance readings. List the tester used for each entry, including the serial number when one instrument performs both functions. Give the ranges or test voltages recorded on the sheet. Mark the leads, reels and clamps that stay with each kit so stores can check them back in together.
Book against the location shown on the work order
Use the Dadri logistics package or the Boraki transport package named on the order, then add the entry point provided by its site supervisor. If the job is inside the adjoining Greater Noida Industrial Township, use the factory plot and its own booking page. For a hired tester going back to an IMT Faridabad workshop, give the workshop’s receipt reference when requesting the return.
Keep the test setting with the instrument number
A field sheet may record an insulation result without showing which test voltage produced it. Include the settings required by the commissioning instruction when asking for tester calibration. For an earth resistance instrument, describe the measurement functions your team uses and identify its dedicated leads or clamps. The instrument name alone may cover several fitted options.
Use the project package reference to connect the quotation, instrument list and dispatch note. If a kit is hired, establish who can approve repair assessment and who receives the final report. Confirm the return destination against the next job allocation so a completed instrument does not go back to a project office that has closed.
