+91 70565 55582[email protected]Get a quoteRequest a call
RTS Calibration
Menu

Micro-ohmmeter and milliohmmeter calibration

A meter used to check a short copper link might spend its working life on one range. The resistance and test current on that inspection sheet are a better starting point for a quotation than the maximum number on the front panel.

Send an enquiry
Four-wire low-resistance meter, equipment illustration
Equipment illustration

Read the value and the unit together

Copy one typical line from your procedure. A value of 500 µΩ is 0.5 mΩ. Writing just “500” on a list leaves the test point open to interpretation. Include the selected test current and the smallest increment the instrument displays on that range. A photograph of the screen can be easier to read than a handwritten micro symbol.

Some instruments reverse the current and display a combined reading. Others take separate readings in each direction. Identify the mode your inspectors use and explain whether the job record needs a single displayed result or a result for each polarity.

Which leads belong to this meter?

A four-terminal measurement has one pair of connections for current and another pair for sensing voltage. A Kelvin clip brings both connections to the workpiece. Give the lead set its own line on the packing list, especially if one set serves two meter bodies. Describe a damaged jaw or an intermittent lead before arranging dispatch.

For the quotation, mark the points that matter to acceptance of the job. RTS can then check the reference and current available at those points, the uncertainty needed and which accessories to include on the report. A separate resistance range on a general-purpose bench meter can be listed with its other functions.

Continuity testers: a resistance result or a switching threshold

Tell RTS what the continuity tester reports. Some models show an ohm value; others indicate continuity with a light or sounder, and a combined instrument may do both. A request for calibration should identify the numerical resistance points or the indication threshold your procedure needs. Include the manufacturer's stated threshold and any separate on/off limits rather than assuming all buzzers respond at the same resistance. If a test-current setting is selectable, put it beside the requested checks.

List the lead set and any zero or lead-compensation setting used by the inspector. For a tester with both continuity and insulation functions, keep the two requirements on separate lines. A numeric resistance comparison can be reviewed against the applicable resistance scope entry; a sounder threshold, response time or complete protective-conductor test needs its own agreed method and reporting description. A continuity indication by itself should not be entered as a measured resistance in the asset record. When arranging return to the workshop, name the person who will review these results against the original inspection instruction.

Resistance bridges and comparison measurements

A resistance bridge may compare an unknown with a separate standard instead of displaying a direct resistance value. Send the bridge model, circuit or terminal arrangement and the ratio or resistance settings used. Identify the reference resistor, detector and leads that form the normal setup. If the report needs a ratio result, state that explicitly; a resistance reading in ohms does not answer the same question. Keep any reversing or balancing sequence with the procedure supplied for review.

For an instrument giving a direct resistance result, list the values, test current and two- or four-wire configuration. The published CC-4643 permanent-facility four-wire entries have specific ranges: 20–180 ohms for measure on page 8 and 10–100 ohms for source on page 10. Those entries alone do not establish coverage of bridge ratios or micro-ohm measurements. RTS should match the required result to the available method before quoting. Include the previous report if the bridge and external standard have always been evaluated together, and explain any component or connection changed since that report.

Handover from a switchgear bench

Where two assembly bays share a meter, give us the bay that will release it and the person expecting the leads back. For a job at IMT Faridabad, include the actual plant gate. For a parcel from another state, keep the instrument number and clip set together on the dispatch note.

Service enquiry