+91 70565 55582[email protected]Get a quoteRequest a call
RTS Calibration
Menu

NDT and concrete assessment instruments

An instrument check, a reference-block measurement and an inspection of a structure are different jobs. Send RTS the method, instrument configuration and result required. These enquiries are reviewed individually; the instrument list below does not establish an accredited inspection service or confirm suitability for a particular component or structure.

Send an enquiry
Ultrasonic flaw detector and concrete rebound hammer, equipment illustration
Equipment illustration

Flaw detector measurement requirements

For a flaw detector, identify the inspection technology and model before listing requested checks. An ultrasonic unit may need indication, time-base or amplitude-related measurements, while setting velocity and zero for a particular material is an application setup. Include the probe, cable and saved setup when relevant. Agree the instrument assessment separately from interpretation of indications found in the inspected component.

Ultrasonic NDT transducer assemblies

Identify the ultrasonic NDT transducer, cable and wedge as an assembly. Record the marked frequency and the application, without assuming the marking is a measured result. State whether the enquiry concerns response with a detector, a reference-block setup or a specified transducer characteristic. A probe change can alter the arrangement; retain the component identifiers used for the agreed measurement.

Calibration block and reference features

For a calibration block, provide its material, drawing and certificate. Mark the dimensions, reflectors or other features used by the inspection procedure. A dimensional result for a step or hole does not establish every acoustic property or the suitability of the block for a different inspection technique. Keep reference blocks identified individually, including any working block used between formal assessments.

Holiday detector output and accessories

A holiday detector enquiry should identify whether the equipment uses a low-voltage wet-sponge method or a high-voltage method. List the output setting, electrode, cable and return connection specified for the job. Ask which electrical measurements and functional checks can be provided. An output check does not establish coating integrity on a structure, and instrument work must not be substituted for the specified inspection.

Rebound hammer and concrete test hammer

For a rebound hammer, also called a concrete test hammer, give the model, impact arrangement and reference anvil identity. Include the manufacturer's verification requirements and earlier observations. A response check on the anvil concerns the instrument; it does not directly certify concrete compressive strength. Any interpretation on a structure needs the applicable test method, surface conditions and separate engineering assessment.

Ultrasonic pulse velocity tester

An ultrasonic pulse velocity tester combines a transit-time measurement with a defined path length. Identify the transmitting and receiving probes, reference bar and cable arrangement. State which time indication or reference comparison is required. Measurements made on concrete also depend on the selected path and conditions, so an equipment check should remain separate from a judgement about concrete quality or strength.

Concrete cover meter

For a concrete cover meter, provide the probe model, bar-size setting and the quantities your survey records. Explain whether the request concerns cover depth, locating reinforcement or an estimated bar diameter. Include the reference arrangement proposed for comparison. Calibration of a depth indication in a defined setup does not confirm every result through congested reinforcement or another bar geometry.

Agree the reporting boundary

Send the equipment list and the required procedure before arranging dispatch or a site visit. RTS will confirm the supported work, reference arrangement and reporting provider. Keep a named NDT or materials specialist available to approve the measurement request. The site engineer remains responsible for the inspection plan and the use of results on the component or structure.

Service enquiry